Wednesday, August 15, 2012

Sweat Equity

We have been given special permission to paint the interior of our house that is under construction to help free up money for other things. I have done a lot of painting in every house we have owned, and many that my parents have owned! I really WANT to paint the house and be able to choose the colors I want and have the two-tone detailing. But I have been slightly stressed every time I have thought about it. Choosing the right colors when I don’t yet own half the furnishings that will be going in the house. Trying to find the right kind of curtains to set the mood I want and to pick wall colors from, without being able to see the room and dimensions for a feeling of space and light. And now I only have three weeks left.

I have been slightly fearful of a project so big that has to be finished in one week. And that it is not only painting, but doing all the caulking in the whole house as well.

And now I realize it will be in the middle of September with no air conditioning!

Besides wanting the paint done my way, we knew that the flooring and lighting allowances were not going to be enough for what we want. I was able to keep my flooring in budget (although I am concerned how it is all going to look), but the lighting went way over. With the money we save by doing the painting ourselves, we can almost afford everything we want. Except, some of my additional lighting requests include additional electrical work. So we are over in electrical and fixtures. I have to figure out now exactly how much we will save, then how much I will have to spend on painting supplies, then how much is left over for electrical/lighting, then figure out which things I want to cut out. And I have to do all this in 1 week before the framing is done and the electrical needs to be installed.

On one hand, the labor and the lack of air conditioning is NOT worth the amount we will save. On the other hand, it helps us to keep some of the nicer amenities I REALLY want to keep!

No comments: